Wednesday, July 20, 2016

Building Update and How We Stay Organized

The drywall men have been working hard the past week and a half and are just about finished.  The paint was delivered yesterday afternoon and they will start painting the walls later this week!

Here are a some pictures of the house with WALLS.  You'll see piles of drywall scraps in the first two pictures.  Hubby and yours truly cleared that out.  We consider it our aerobic workout!
Great Room
Master Bedroom
Better!

Standing in the kitchen, looking into the dining area.  
The great room is to the left.

We're pleased about how much light there is in the two basement bedrooms.  The first one will be 'Favorite Son's
and this one will be Precious Daughter's and Handsome Son-in-Law's when they visit.
J's Lodge area is roomy and filled with lights.  No 'man cave' in our house!
He will be adding the reclaimed barnsiding from an old building on the property to the unfinished walls.  A more sturdy wall board will be added prior to installation.  
(That's why there is no drywall on those walls.)
Even the lower level bathroom is coming along!

Once the sanding from the drywall process is completed, the HVAC guys will come to hook up the air conditioning/heating unit and we'll see how the geo-thermal experiment works. Keep your fingers crossed!!  The wood floor installers need the air conditioning on to remove the humidity from the house.  We live in Missouri and we have TONS of humidity in the summertime. 

I've made some more decisions this past week.  They include the garage door, shelving for all of the closets and pantry and railings and banisters.  We've also ordered the hard wood flooring.  I've also set up a schedule for flooring installation, cabinet delivery and installation and the finish carpentry work.  J's done a wonderful job on his responsibilities (gravel, concrete, framing, brickwork, etc.).  I want to make my part run almost as smoothly.

Before we began this new home building project, I was worried we might be overwhelmed with the bid process and keeping everything organized and easy to find.  
When I taught school, one of the best organizational tools I used was a simple binder. I still have a bunch of them so I got out the biggest one I could find and set up an organization system that made sense to me. 
I made tabs for all the different types of contractors we would be needing (i.e. concrete, framing, plumbing, HVAC, painting, etc.) and added plastic page protectors. As each bid came in, I printed it off and slipped it in one of the protectors.  
 I also created an Excel-type sheet on Google Docs with pertinent information for the contractors we contacted including phone numbers, addresses, emails, amount of bid, if they were given a set of plans or sent them via email, etc. This was updated each time we received a bid and was a handy way to see them at a glance.  The binder allowed J to compare each bid, analyzing each component.  

Once each contractor was chosen, both he and the other contractors were notified. That way, they knew if they were hired for the job or not.  I discarded the unused bids which, at this point, was a good thing.  Our beloved binder was starting to fall apart!  We took it everywhere from the STL Home Show to the lumberyard to order material.  The lumberyard manager attends our church and ask to look at our 'well-used' binder.  He teased me about being too organized but had to admit it was quite helpful.  There was a concern that a specific truss hadn't been ordered and I had the (ten page printout!!) truss bid and, yes, it had been ordered! 

Once the binder contained only bids for hired contractors, I placed signed contracts, specific orders like faucets, appliances, light fixtures, etc. with that particular contractor. When the plumber asked if I had different faucet choices than his included in the bid, I simple found his section, pulled out the updated order and made him a copy.  When our appliances are delivered, I will double check each is the exact model I ordered.  The receipt is stored in the binder.

I've also included a few other things here, too.  As I mentioned in another post, I'm not very good at using vision boards so if I see something I like in a magazine, I tear it out and slip it in the binder for future reference.  


Earlier this year, before we actually started building, I took the plans and tried to envision how each room might look with furniture.
It's been fun to rework the rooms in different configurations with different pieces of furniture.

That's the update for now.  I hope to show you beautiful painted walls next.  Right now, I'm off to start sweeping up drywall dust.  I can't wait until the air conditioning is turned on!!  Thanks for stopping by!  
                                                                      Zenda



Linking to these great parties:

Tuesday, July 5, 2016

Decision, Decisions

It's starting to become crunch time as far as decisions are concerned.  All of the 'Pins,' notes, discussions, etc. are all adding up to final decisions!  Here's a picture of my dining room table as I write.
I've tried using online idea boards to put all of my options together but nothing works quite as well for me as actually having the components right in front of me.  Here are most of them.

The drywallers have started working today.  They plan to have the wallboard hung this week and begin taping, too.  This company also does painting.  They will use Sherwin Williams paint and right now am leaning toward a "greige" color for most of the interior walls.  I originally thought about "Useful Gray," which you see below, second from the bottom.  After looking at it in different lights, I decided it has too much green in it.  My new choice is "Agreeable Gray."  You will see it a few pictures down. 
The two quartz examples are from Vicostone.  The dark is called Royal Grey, which will be on the island and the marble-looking one is called Statuario and it will be on the cabinets that are along the walls.  I'm considering either a plain white matte subway tile or a lightly veined matte subway tile for the back splash. 
I'm leaning toward the white as I don't really like the look of the two patterns competing.  Either way, both options will be easy to clean (no marble here!).  This girl likes to cook and can really make a mess when she does!
The cabinet color I've chosen is close to SW Marshmallow (#7001).  The cabinet maker uses a different type of paint but his color was close to this color.   I'm feeling better about the new wall color choice, Agreeable Gray, and hope SW still mixes it.  My paint fan is a few years old (from my SIL) but I'm sure they can still find the recipe.  There won't be much wall space around the cabinets as they will go to the ceiling but most of the house will have this color.
The two upstairs bathrooms will have this for the flooring with dark wood vanities.  Since they will have limited natural light, I think I'll go with the lighter shade in this color family, "Incredible White."  I'm really liking the new luxury vinyl tile (LVT) flooring.  This stuff is sturdy, yet beautiful!  It will also be in our mudroom, laundry room and master closet.  The rest of the flooring on the main floor will be site-finished hardwood in a medium brown tone.  The wood floors at our current house are the 1980's orangy color.  I love my real hardwood, just not in love with the color anymore.
The finished basement rooms will have this LVT in a rustic wood look.  J's lodge area (no caves in my house!) will have some old barn siding on a couple of walls and this flooring looks good with that.  
The only carpet will be on the stairs leading to the basement.  We've chosen the Berber carpet next to the LVT sample.  It's called "Cornhusk."

The drywall was delivered late last week.  Here, J's giving a tour to our future son-in-law.  This is the dining area.
The great room
J's lodge room
Brickwork on the front is complete!  The bricklayers have moved to the garage now.  They will probably be here another two weeks.

That's our building project update for now.  I can't wait to show you more when we actually have SOLID walls!  Thanks for stopping by.  




Linking to:
   

Friday, June 24, 2016

I Was the Give-A-Way Winner!!

I had a wonderful surprise last week when I heard I was the winner of Barbara Woods' give-a-way from her blog Wont-to-be Quilter!!  I received my package earlier this week and what a beautiful assortment of fabric she sent!
The BLUE theme is perfect for two of the first projects I'll be undertaking when we get moved into our new home.  Our niece just had twin boys about a month ago.  I'll be making each a baby quilt for Christmas and Barbara's fabric will be perfect with the other fabric I've been considering!

The quilts I'm thinking of making will be in a bow tie pattern similar to this in blue and gray or agua and gray,

or maybe a pinwheel pattern (no pink, of course!)
or perhaps a pennant quilt.
A chevron pattern would be cute, too.  
Oh, so many choices!  I can't wait to get in my new craft 'studio' and start creating!!  Which ever two patterns I choose, I have to thank to Barbara for pointing me in the right color direction!  

Check out her blog, wont-to-bequilter.blogspot.com, to see the projects she's been working on.  Her tumbler quilt is gorgeous and her tutorial on making a quilt wreath is informative and easy to follow.  

Thanks again, Barbara!!  

Linking to:

Home Matters


Saturday, June 18, 2016

June Gardens at Two Homes

As many of you know, we are building a new home this summer.  It's an exciting time of anticipation but also one that's bittersweet.  We have made many happy memories in our current home and will hate to leave the only home our children have known.  
I've also worked hard over the years to create flower gardens that make me smile.  I shared some of those spring blooms here and now, that they have passed, it's the early summer flowers' turn.  
Day lilies along the back of the house.


The lilies along the border between the yard and woods will be about a week later.
Tiger lilies in the peony beds, 
along with wild geranium
and two kinds of monarda or bees balm.  This brilliant red
and this delicate lavender color.

I've tried to plan ahead and moved some of my plants like the hostas and lilies to holding beds at my mother-in-law's house but some I've just potted up and hope to keep healthy until the move.  Here are some viburnums, (one actually bloomed!) a multicolored pepper and a miniature rose J gave me years ago.  The little rose is in the butterfly garden outside my kitchen. I decided to try to repot it for the move and it actually divided.  I didn't know I could divide it (and I'm not sure if it should have. ??)  However, the new section has thrived in it's pot and even bloomed!  
I also have some cone flowers ready to go to the new house.  
I may take them over as soon as we have a nice rain.  As I was leaving the home site this morning I saw some wild cone flowers in our new front yard along with some rudbeckia!
I took these shots as I was driving down the driveway!  J planted these wildflowers last year as part of a soil conservation/prairie project.  Won't this area be gorgeous in a few years?!
And here are a couple of shots around the pond near our new home.

Thanks for stopping by to visit.  I hope you have a happy week!

                                                    Zenda


Linking to:


Flatwork, Ductwork, Brickwork, Oh My!

I'm sorry it's been awhile since I've posted an update on our house construction.  It seemed we had been moving along at a good clip once the initial work began but then several of our contractors had scheduling issues and that backed up everyone else.  Our plumber and electrician were both unaffected and continued their work but that wasn't too fun to photograph!  (*Extremely important, as far as home construction, though.*) 
Here is a picture of the kitchen with can lighting.  I will have a fixture over the island similar to this -
but the perimeter of the kitchen will be lit with the 'cans.'
As you can tell, there wasn't much to photograph concerning the electric work and plumbing.  

Two weeks ago, the flatwork guys came and poured the porch, basement and garage floors!  
We hoped the HVAC guys would come soon to put in the duct work so the framers could finish their work in the basement.  A family emergency kept them from coming until middle of last week.  They will finish Monday morning and the framers will be here then to begin their work.  
Duct work is coming along, though.

Since we are in the country, we have to provide our own water.     
Another important part of the construction was drilling the well.  Here the drillers set up their equipment just to the east of our house.
They installed the pump in the basement and just like that, 
We have water!!  Well, outside water anyway.  Which is good because late this week the bricklayers came!!  
The brick style we chose was Boral Heritage Trail in closure size.  Closure is a bit bigger than standard bricks and we liked the look for our exterior.  The stonework around the doors and windows is called Aux Vases Snapped.  We went with a natural color mortar.
The bricklayers set up their equipment and got to work Thursday and had quite a bit done by Friday afternoon.
When they began, I was a bit worried the mortar would be too dark
but it has lightened as it dries!
This picture was taken this morning with the front door closed.  We love it!  

The door will get a coat of paint.  I'm thinking about a dark gray.  It needs to coordinate with the garage door so I'll be checking into what colors the garage door people offer. 

Our bricklayers will be here for awhile as the entire exterior will be brick and stone.  Even the back grilling area will have a fireplace.  I can't wait to see that completed!! 
The brick delivery people dropped the brick pallets every few yards around the house.  They also dumped sand for the mortar in both the front and the backyards.  

After a week of slow going, which gave us the time to clean up inside and out, we look forward to seeing how the basement bedrooms, bath and J's lodge area take shape and how the exterior looks when completed!  

J says the next few things on the list will be installation of the basement windows and door, insulation and then maybe drywall!!!  Ooo, I can hardly wait!! 

Slow and steady.  Thanks for stopping by.     
                                      Zenda


Linking to: